Clayton Park School

The Clayton Park School masterplan required flexible learning spaces and generous outdoor areas for the multistoried
new classroom blocks. The masterplan design further allows for a ‘future proofed’ design which can be added to at a later date without compromising the architectural design of the school.


Relocatable classrooms were used during construction to provide greater flexibility throughout the build. These classrooms have since been retained on site. The site had a number of geotechnical and topographical challenges which were mitigated with retaining walls and the careful placement of the new building blocks.

our-people

OUR PEOPLE

We all worked in large architectural firms earlier in our careers.

awards

AWARDS

At Brewer Davidson we have been recipients of many awards since 1995.

sustainability

SUSTAINABILITY

Brewer Davidson has an industry leading level of experience in sustainable design and consulting.

Our-Blog-v2.jpg

OUR BLOG

Keep up-to-date with the latest news on Brewer Davidson and our projects.